Gongju Natural Gas Power Plant ,Cooling Tower Project, Gongju-si, Chungcheongnam-do, South Korea

  • Building Type:
  • Energy Construction
Fullscreen map Close

Peikko is setting new benchmarks in Korea’s construction industry with its fourth cooling tower project, a landmark public-sector achievement. This project proves how Peikko helps partners build smarter, faster, and safer.

Accelerating Construction Through Innovative Solutions

One of the most notable advantages of applying Peikko’s solution to this project was the remarkable speed of installation. By combining precast concrete construction with Peikko’s state-of-the-art connection systems, the overall construction period was reduced by more than two months compared to traditional cast-in-place methods. This time savings not only improved project efficiency but also contributed to significant cost reductions and resource optimization.

 

Safety and Quality Without Compromise

Equally important, the entire project was completed without a single safety incident, underscoring Peikko’s commitment to delivering solutions that prioritize both speed and safety. Every component was designed and installed to meet the highest standards of quality, ensuring long-term durability and reliability.

 

Setting the Benchmark for Future Construction

This project clearly demonstrates how Peikko’s technology can transform modern construction practices, delivering measurable benefits in terms of efficiency, safety, and sustainability. As Peikko continues to innovate, we remain committed to supporting our clients with solutions that redefine what is possible in the construction industry—both in Korea and worldwide.

Read more down-arrow.png

Project facts

Project size:
8 cooling towers m2
Developer:
KOREA WESTERN POWER CO.,LTD
Construction Company:
KUMHO E&C
Structural Designer:
CHOIS STRUCTURAL ENGINEERING
Architect:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Precaster:
SINWOO CONCRETE INDUSTRY CO.,LTD
Delivery year:
2024~2025
Completion year:
2025